Advisory on Proper Entry of RR No./Parcel Way Bill (PWB) Numbers in EWB System Post EWB-PMS Integration
October 4th, 2024


Subject: Guidance for Accurate Entry of RR No./Parcel Way Bill (PWB) Numbers following the Integration of E-Way Bill (EWB) with Parcel Management System (PMS)





Dear Taxpayers,

We are pleased to announce that the Parcel Management System (PMS) of Indian Railways has now been successfully integrated with the E-Way Bill (EWB) system through Application Programming Interfaces (APIs). This integration allows for the seamless transfer of Railway Receipt (RR) Numbers or Parcel Way Bill (PWB) data directly from the Railways to the e-way bill portal, enhancing traceability and ensuring compliance.

In light of this update, taxpayers must follow the guidelines provided below to ensure accurate entry of Parcel Way Bill (PWB) numbers in the EWB system. Proper adherence will help prevent discrepancies or data mismatches during the transportation of goods via Indian Railways.


1. Applicability of RR No./PWB Entry in the EWB System

If you are transporting goods through the Indian Railways Parcel Management System (PMS), it is mandatory to provide the correct Parcel Way Bill (PWB) number or RR Number in Part-B of the E-Way Bill (EWB) on the portal. The format of entering these numbers has been standardized to ensure accuracy.


2. Updating Part-B of the EWB for Rail Transportation

For suppliers or taxpayers transporting goods via railways under the Parcel Management System (PMS), follow the steps below to update the E-Way Bill accordingly:

  • Step 1: If you already have an EWB created for goods transported from your factory or warehouse to the railway station, and the next leg of transportation is through railways, you need to update Part-B of the EWB.
  • Step 2: Select the “Multi-Transport Mode” option on the EWB portal and choose Rail as the mode of transport.
  • Step 3: The system will prompt you to enter the corresponding RR No./Parcel Way Bill (PWB) number for the goods.

3. Format for Entering the RR No./PWB Number

To ensure proper data validation, the Parcel Way Bill number must be entered in the following format:

PXXXRRNo, where:

  • P represents the Parcel Management System (PMS).
  • XXX refers to the From Station Code (originating railway station).
  • RRNo is the actual Railway Receipt number issued for the consignment.

Example:
If the Railway Receipt number is 2020-307306 and the originating station code is NZM (New Delhi Railway Station), then it should be entered as:

PNZM2020-307306

Here,

  • “P” stands for PMS,
  • “NZM” is the station code,
  • “2020-307306” is the RR number.

4. RR Number for FOIS or Leased Wagons

For goods transported using the Freight Operations Information System (FOIS) or Leased Wagons, the method for entering the RR Number remains unchanged from previous advisories. Taxpayers should enter the RR number in the EWB system exactly as it appears on the Railway Receipt, without any formatting changes.


5. EWB and RR No./PWB Number Validation

Once the RR No./PWB number is entered in the EWB system, the following will occur:

  • The EWB system will validate the entered RR No./PWB number against the data provided by Indian Railways’ Parcel Management System (PMS).
  • If the entered RR No./PWB number does not match the data in the PMS database or is incorrect, an alert will be triggered.

Note: To avoid these discrepancies, it is crucial to double-check the RR No./PWB number before submission.


6. Importance of Accurate Entry

Accurately entering the Parcel Way Bill number is essential for:

  • Ensuring proper tracking and validation of goods transported through Indian Railways.
  • Preventing delays caused by errors during the validation process.
  • Complying with regulations to avoid potential issues during audits or inspections.

7. Assistance and Clarifications

For any assistance with entering RR No./PWB numbers or if discrepancies arise, taxpayers can raise a support ticket. When doing so, be sure to provide the correct RR No./PWB number to expedite the resolution process.


Note: A sample image illustrating the correct format for entering the RR No./PWB number is available for reference within the EWB portal. Taxpayers are encouraged to view this for guidance.


We appreciate your attention to this important matter and your continued cooperation in ensuring compliance with the updated guidelines.


Thanking You,
Team GSTN


This advisory aims to ensure that taxpayers follow the proper process for accurately entering RR No./Parcel Way Bill numbers following the integration of the EWB system with Indian Railways’ PMS, helping to streamline compliance and reduce the potential for errors.


Visit www.cagurujiclasses.com for practical courses




Pooja Gupta

CA Pooja Gupta (CA, ISA, M.com) having 15 years of experience. Educator and Digital Creator

Disclaimer:- The opinions presented are exclusively those of the author and CA Guruji Classes. The material in this piece is intended purely for informational purposes and for individual, non-commercial consumption. It does not constitute expert guidance or an endorsement by any organization. The author, the organization, and its associates are not liable for any form of loss or harm resulting from the information in this article, nor for any decisions made based on it. Furthermore, no segment of this article or newsletter should be employed for any intention unless granted in written form, and we maintain the legal right to address any unauthorized utilization of our article or newsletter.

CA Pooja Gupta (CA, ISA, M.com) having 15 years of experience. Educator and Digital Creator

Leave a Comment